chesterfield developments

Chesterfield Waterside progressing well in 2021

The town’s £340 million Chesterfield Waterside scheme continues apace following the submission of an additional Reserved Matters application for the remaining elements of Basin Square, to the new ‘One Waterside Place’ office accommodation.

Recognised as being one of the UK’s largest regeneration projects, Chesterfield Waterside is being led by Chesterfield-based Bolsterstone Group Plc working in conjunction with Arnold Laver Group and Chesterfield Borough Council.

Since 2019 the scheme has made significant progress with construction beginning on 173 two, three and four-bedroom homes at Waterside Quarter in 2020 followed by the start of construction on the seven-storey office block – One Waterside Place at Basin Square, in 2020.

Avant Homes’ £36 million development forms part of The Park character area of Chesterfield Waterside and is the company’s largest site in the Chesterfield area to date.

The showhomes opened in August last year and in only six months nearly 20% of the 173 homes at Waterside Quarter have been sold with some already occupied.

Avant Homes Central head of sales, Dawn Bennett, said: “We’ve received a great response from buyers at our Waterside Quarter development and interest in our homes has remained consistently strong since its launch in 2020.

“In September, we unveiled three of our design-led two, three and four-bedroom showhomes, which were shortly followed by our first residents moving into their homes.

“Work on-site is still progressing well and with more than 30 homes now sold, we’re hugely excited to continue to see great success at Waterside Quarter.

“The showhomes comprise of The Beckbridge, The Northbridge and The Westbridge house types, all of which have elevations that are entirely bespoke to this development. These properties have given interested buyers a chance to see the Avant Homes specification first-hand by personal appointment and, as a result, we’ve seen a surge in interest for our homes.”

Last year, the Basin Square character area at Chesterfield Waterside also made significant progress. The first phase will see the delivery of Grade A office space, known as One Waterside Place, to meet the requirements of local occupiers. Tenants have already been secured for part of the building, and further tenants are being sought by property agents Knight Frank and FHP. In September 2020 Chesterfield Borough Council secured a forward funding agreement with Chesterfield Waterside Ltd, to bring forward construction of Waterside Place in the Basin Square neighbourhood of the development.

Harry Orwin-Allen from the Sheffield office of Knight Frank, said: “Chesterfield Waterside is an exciting, high quality, mixed-use scheme which will revitalise the eastern side of Chesterfield on an unprecedented scale for the town.

“This development comes at a time when Chesterfield is becoming a popular base for SMEs with its good town centre facilities and links to the motorway network.”

The office block is part of a wider business and residential offering in phase one of Basin which comprises offices, a hotel, multi-storey car park and build-to-rent apartments, which will be centred around the new canal basin and pedestrianized public realm which will be home to the renowned Dame Barbara Hepworth sculpture.

Britcon (UK) Ltd, a leading Civil Engineering, Building and Steel Frame Solutions company began construction of the office block in October. As part of the contract with Chesterfield Borough Council, Britcon will utilise local labour and local contractors across the whole build process as well as working closely with Chesterfield College.

Councillor Tricia Gilby, leader of Chesterfield Borough Council, said: “Work is progressing well on site and we hope that One Waterside Place will be complete and ready for businesses to move into from September 2021. The development, which is being led by local company Bolsterstone PLC, has already created around £1.7 million of orders for local contractors. The project is also helping young people develop skills – an innovative partnership with the college is allowing students to track the process and learn more about the construction industry. When Covid-19 restrictions allow, there are further plans for site visits for local schools, and on-site work experience opportunities.

“Waterside is just one of several major developments in Chesterfield that will help ensure the town has a strong economic recovery following the pandemic. Together with our HS2 Station Masterplan it will see that area of the town completely transformed, making it more attractive for visitors and businesses, which will help further strengthen the local economy and ensure there are great opportunities available to everyone in our community.”

Peter Swallow, Managing Director of Bolsterstone Group PLC which is leading the Chesterfield Waterside scheme, said: “We are delighted with the progress Chesterfield Waterside is making with both the residential and commercial offering. The strong interest from both residents and businesses is testament to both the progressive design and quality of the buildings at Waterside.

“The submission of the Reserved Matters application ensures that the progress we are making continues at pace despite the challenges posed by the pandemic.”

You can find out more about the Chesterfield Waterside development here: https://www.chesterfield.co.uk/developments/chesterfield-waterside/

To book an appointment to view the showhomes at Waterside Quarter call 01246 889 450 or visit www.avanthomes.co.uk/waterside-quarter/

Posted in About Chesterfield, Celebrate Chesterfield, Destination Chesterfield, Development, Featured, Home, UncategorisedTagged in , , , , , , , ,

Students wow the Gateway at PEAK development team with architectural designs

Students at the University of Derby have impressed the team at Milligan, who are developing the Gateway at PEAK, after unveiling their architectural visions for the UK’s first fully-serviced national park gateway based in Chesterfield.

The Gateway at PEAK will be part of the 300-acre PEAK Resort, consented on the eastern boundary of the Peak District. As part of developer Milligan and landowner Birchall Properties’ partnership with the University of Derby, undergraduate and Masters level students responded to a live brief and were challenged to assume the role of architect on the project.

The students were asked to consider local communities, wildlife preservation, sustainable design with a Net Zero Carbon objective, and respectfully incorporate the Peak District’s natural beauty into their designs.

The students worked in teams to envision scheme designs and complementary uses such as F&B, retail and exhibits, delivering unique concepts that offered a broad spectrum of options for the developers to consider.

After all the proposals were submitted, the Milligan development shortlisted four finalists who were awarded a share of £1,000.

The Gateway at Peak architectural designs – University of Derby

Dr Boris Ceranic, Course Director for Masters Programmes and Centre of Excellence Leader at the University of Derby, said: “I was impressed by the quality of the work and particularly pleased by the way undergraduate and Masters students have worked together as a team to deliver such complex and demanding design charrette briefs.

The designs were inspiring, with highly sustainable and distinctive visions of unique visitor experiences, resolved through proposals that blurred the boundaries between the open and enclosed, solid and transparent, static and fluid, natural and built environment.”

Lecturer, Graham Markwell comments, “This live project has allowed us to work with industry partners to deliver a high-quality experiential learning initiative. The students have produced innovative solutions to the brief provided and have greatly benefitted from interacting with professional clients and real-world projects.”

The Gateway at Peak architectural designs – University of Derby

Gary Dawson, second year student on the BA (Hons) Interior Architecture and Venue Design talks about the project and the valuable experience it provided; “We really enjoyed working on the project, being able to apply our creative skills to a public space of the future was fantastic and gave a real sense of how we will apply the skills we are learning in future careers. Having the opportunity to push ourselves and see what we can accomplish, in the limited time we had, helped us all begin to realise what we are capable of achieving and what our futures might be like.”

For Milligan the project was a great way of not only accessing some fresh thinking for the development but also a way of inspiring the next generation of creative talent within the industry.

Paul Hanegraaf, Creative Director at Milligan notes “I was blown away by the quality and thought put into each submission – especially as the students had little under a week to prepare.

We have been developing the plans for the Gateway at PEAK for some time and will soon be announcing the architect we have appointed before revealing their plans later in the year.

It’s wonderful to have input and inspiration from the next generation of designers, planners and architects, after all, it is that generation we’re building this inspiring place for.”

The Gateway at Peak architectural designs – University of Derby

Rupert Carr, Director of Birchall Properties adds “I was delighted with the quality and the quantity of the work produced by the students in such a short period of time. It was nothing less than remarkable and I was genuinely uplifted by the thinking and consideration behind the concepts the students shared.

“Of particular note for me was the way all teams expressed real enthusiasm for and belief in the potential for a better built environment, one with an underlying philosophy to deliver social and environmental benefits as well as great commercial opportunities”.

The Gateway at PEAK is part of PEAK Resort, where works for the all-weather, all-year, all-ages Summit at PEAK, are already underway. PEAK Resort also has planning permission for up to 2,000 hotel rooms and 250 lodges as well as a whole range of leisure, education and entertainment facilities, attracting investment and creating employment opportunities.

The Gateway at Peak architectural designs – University of Derby

Posted in Business, Celebrate Chesterfield, Destination Chesterfield, Development, Featured, Home, Leisure, Uncategorised, VisitingTagged in , , , , , ,

More partners announced for The Gateway at PEAK

Mixed-use developer Milligan has appointed further specialist partners to collaborate on the Gateway at PEAK, the UK’s first national park gateway, consented on the eastern boundary of the Peak District in Chesterfield.

Architects Stanton Williams, technology specialists RDS Global, operations consultant DN Consultancy and landscape architects Gillespies, have all been appointed by the Milligan development team.

In July 2020, Milligan formed a unique working group of local stakeholders on the development of Gateway at Peak, part of PEAK Resort.

Since then, the vision for a sustainable hub, welcoming visitors to the Peaks, providing food and accommodation, retail opportunities and environmentally friendly options for onward travel into the park, has been taking shape. The latest partner appointments are an exciting milestone in the progress of the development.

Milligan has a long history of collaboration with Stanton Williams, an award-winning practice well positioned to realise the sustainable and Net Zero Carbon objectives of the Gateway thanks to experience on similar projects and its own Carbon Neutral Zero Plus accreditation.

RDS Global will work alongside the Milligan team to plan and manage the project’s IT platform, deploying its new technology – BlackBox. The RDS BlackBox can consolidate multiple datapoints and communication forms which will power real time, actionable data to enrich customer experience and track energy metrics to support the development’s sustainable goals.

David Norris of DN Consultancy will orchestrate the management and operational strategies and prescribe the environmental, social and governance factors across the Gateway at PEAK.

Also appointed to the team, is award-winning landscape architecture practice, Gillespies who have been leading landscape and public realm design for over 50 years. Utilising strong design principles and an understanding of the natural landscape and environmental context, Gillespies will work with Milligan to deliver transformative planning and design, unlocking the potential of the Gateway at PEAK, to create an inspirational space with a clear-cut purpose, to make people’s lives measurably better.

Melanie Taylor, director of leasing and commerce at Milligan said: “Our work on the Gateway at PEAK has reached a new phase. Landowner Birchall Properties and the regional stakeholders have entrusted us to find and manage specialist partners who are going to bring expertise and value to this unique project. The Gateway is going to be an exciting destination for all types of visitors, each looking for something different from their visit to the Peaks.

“We’re confident that having Stanton Williams, RDS Global, David Norris and Gillespies around the table, we’ll be pushing boundaries and delivering ground-breaking and creative ideas that surprise and delight those visitors. The project will also support the local community through jobs and collaboration and preserve the natural beauty of the park with considerate construction, rewilding and education.”

The Gateway at PEAK is part of the 300-acre PEAK Resort, where the development of an all-weather, all-year, all-ages Summit at PEAK, is already underway, with an opening planned in Autumn 2021. PEAK Resort also has planning permission for up to 2,000 hotel rooms and 250 lodges as well as a whole range of leisure, education and entertainment facilities, attracting investment and creating employment opportunities.

You can find out more about the PEAK development here: https://www.chesterfield.co.uk/developments/peak-resort/

 

Posted in About Chesterfield, Celebrate Chesterfield, Destination Chesterfield, Development, Home, Leisure, Uncategorised, VisitingTagged in , , , , ,

Families set to benefit from new play and fitness facilities in Staveley

Staveley residents are set to benefit from the first improvements to the town as part of the Staveley Town Deal, which sets out ambitious plans to pull in more than £25m worth of funding to the area over the next five years.

Initial funding worth more than £140,000 will be used to invest in new play and fitness facilities at King George V Playing Fields. This will create a fantastic new space for families to create memories together and for residents to exercise in.

The money has been secured thanks to a Chesterfield Borough Council bid to the Government’s Town Deal Accelerator Fund – submitted on behalf of the Staveley Town Deal Board as part of wider plans to regenerate the town.

It follows further investment by the council in the park which saw creation of bowling facilities and a new skate park; together all these improvements will ensure that the park has facilities suitable for every age group.

Ivan Fomin, Chair of the Staveley Town Deal Board, said: “It’s fantastic to see the Town Deal delivering funding for facilities that will directly benefit local residents. These improvements are the kind of grassroots project that I hoped we could deliver as part of the Town Deal. It may not be a high financial cost compared to the total value of the Town Deal, but it will make a massive difference to local families.”

The planned works include a new play area which will have a range of equipment for both juniors and toddlers. It will also aim to encourage imaginative play through its design and features, like play panels.

As well as the play area, a new fitness zone will be created. Within this there will be an outdoor gym area where residents can do more than 200 different types of exercise. It will also feature a multi-use area for basketball and football.

Councillor Jill Mannion Brunt, Chesterfield Borough Council’s cabinet member for Health and Wellbeing, said: “As we’ve all seen over the last year, providing excellent outdoor facilities is important for everyone. They provide a space for the community to socialise and are an important place for young people’s development. They are also becoming more popular as exercise venues.

“We are working closely with our funding partners to help deliver this fantastic new play and fitness space in King George V Playing Fields. I am sure that local residents will create lots of great memories in this space and keep active for many years to come.”

Paul Greenfield, Area Sales Manager for Kompan, said: “Kompan are the UK’s leading outdoor play, sport and fitness provider and we are delighted to have been selected as Chesterfield Borough Council’s partner for this exciting project. We look forward to bringing our fun and exciting play products, and state of the art fitness range to the community of Staveley.”

The work is set to begin in March and will be managed by Chesterfield Borough Council and delivered by Kompan.

Find out more about regeneration in Staveley here: https://www.chesterfield.co.uk/developments/staveley/

Posted in About Chesterfield, Celebrate Chesterfield, Destination Chesterfield, Development, Featured, Home, Leisure, Uncategorised, VisitingTagged in , , , , , , , , ,

Have your say on ambitious regeneration plans for Chesterfield

People are being encouraged to have their say on ambitious plans to transform the area between the town centre and Chesterfield Train Station – creating a vibrant gateway to North Derbyshire and setting out potential sites to create around 850 new jobs.

The HS2 Station Master Plan was approved by the council’s Cabinet on 2 February and will now be put out for public consultation. Residents, businesses, train passengers and visitors to the town can have their say between 8 February and 8 March.

The proposals – which can be viewed in an innovative virtual exhibition – set out a vision for the future development of the area and are also designed to make the most of the once-in-a-generation plans for a High Speed Rail (HS2) link at Chesterfield.

Councillor Tricia Gilby, Leader of Chesterfield Borough Council, said: “Despite the challenging economic times posed by the Covid-19 pandemic, Chesterfield is not standing still and we’re pressing ahead with our £1 billion growth programme – carving out a prosperous future for our borough, while creating jobs and homes for local people.

“Our HS2 Station Master Plan is a key element of this work and we’re now asking for local people, businesses, train passengers and visitors to give us their views to help shape the future of our town.

“We want to create a vibrant gateway to North Derbyshire and the Peak District, to better connect this key site to our town centre, and to bring unused and underused land back to life for the benefit of local people. The proposals also have sustainability at their heart – setting out infrastructure improvements to support cycling, walking and better access for public transport.”

Due to the ongoing Covid-19 restrictions in place, people are being invited to take part in a virtual consultation, with an online exhibition setting out the key proposals. They include:

  • Establishing the principle of new development plots to accommodate a mix of uses with the potential to generate a minimum of approximately 850 jobs
  • A new station link road (a through route) between Brimington Road and Hollis Lane with improved public transport access
  • Closure of the A61 on-slip road
  • A new public ‘boulevard’ for pedestrians and cyclists (including segregated cycle lanes) leading from the station to Corporation Street
  • Replacement of the existing A61 footbridge between the station area and Corporation Street with a new wider bridge, including a segregated cycle route.
  • Suggested changes to Corporation Street to improve accessibility for pedestrians and cyclists whilst retaining vehicle access to businesses.
  • A ‘transport hub’ including a multi-storey car park (with around 550 bays) and charging points for electric vehicles
  • A cycle hub with e-bike hire and secure cycle parking
  • An overall layout that has the potential for a higher quality of natural habitats including more tree planting
  • A new station forecourt to better accommodate buses, coaches, taxis and a drop off/collection point.
  • A continuous cycle link from Hollis Lane area through to Crow Lane

Councillor Gilby added: “Our proposals also seek to harness the once-in-a-generation opportunity presented to our region by the HS2 project – a chance to cement Chesterfield’s position as a thriving place to invest and do business.

“But it’s important to note that this plan can be delivered ahead of – and independently to – the national project if needed.

“This is a flagship plan for our borough’s future, and we’re keen to hear the views of as many people as possible. Their input will help shape the final version of the Master Plan, which will be used to drive forward regeneration in the town centre.”

Funding for regeneration at and around the station and the preparation of a masterplan has been obtained by Chesterfield Borough Council and Derbyshire County Council through both the Sheffield City Region (SCR) and East Midlands (D2N2) Local Economic Partnerships.

Visit www.chesterfield.gov.uk/HS2-station-master-plan to find out more and access the consultation, which is being run by consultants AECOM. Online materials include a 3D ‘fly-through’ video of how the site could look. (Please note, the virtual exhibition cannot be accessed until the consultation opens on Monday 8 February).

Hard copies of the documents can also be requested and will be provided in a Covid-safe way – please call 01246 959707.

Posted in About Chesterfield, Business, Celebrate Chesterfield, Destination Chesterfield, Development, Featured, Home, Leisure, Uncategorised, VisitingTagged in , , , , , ,

Flats and apartments set to be created in landmark Chesterfield Town Centre building

A prominent building in Chesterfield Town Centre is set to be brought back to life, with the property set to be converted into a mix of studio, apartment and flats.

Chesterfield Borough Council approved a planning application from the Tamcourt Group (JLK Architectural design) to convert the upper levels of a former Greggs bakery shop into residential dwellings.

Situated on the junction of Packers Row and High Street in the town centre, the property will consist of one-bedroom studios, one and two-bedroom apartments and a third-floor extension on the existing flat roof section of the building to allow space for two one-bedroom apartments.

Councillor Kate Sarvent, cabinet member for town centres and visitor economy, said: “Creating attractive places to live in the heart of the town contributes to a thriving and sustainable town centre for the future, and supports the night-time economy.

“Developments like this are a positive step forward for the town centre, providing well-located homes, close to shops, leisure and entertainment venues – and increasing the options for local people when choosing what kind of home they would like to live in.”

In the planning documents, Phillip Riden, chairman of the Chesterfield and District Civic Society said: “We strongly support the proposal to restore the ground floor of the building to retail use, and the creation of studio and one-bedroom flats above.

“This will increase the supply of reasonably priced accommodation in the town centre and bring another building back into residential use, a policy which we consider highly desirable.

“In the mid-nineteenth century half the one hundred or so separate properties in the shambles were residential: town centres evolve as needs and tastes change and these may go round in a circle.”

You can find out more about developments taking place across Chesterfield and North Derbyshire on our website here: https://www.chesterfield.co.uk/developments/

Posted in About Chesterfield, Destination Chesterfield, Development, Featured, Home, Uncategorised, VisitingTagged in , , , , , , ,

Council leaders urge Government to back HS2 Eastern Leg in response to NIC report

Chesterfield Borough Council has released a response to the National Infrastructure Commission (NIC)’s recently published report that has recommended scaling back HS2’s Eastern Leg in favour of regional rail link development.

Don’t Cut Here! A Case study on Why the economies of Chesterfield and Sheffield need HS2 in full has been released today (Wednesday 22 December 2020), urging the Government to deliver on its promise of developing HS2’s Eastern Leg to “regenerate, level up and make a real difference to people and communities” in Chesterfield and Derbyshire.

The case study has been released by Chesterfield Borough Council, in conjunction with Connecting Britain to highlight what it says are HS2 East’s “enormous opportunities for the UK economy that will drive growth, but which are currently at risk of being thwarted.”
It follows the NIC’s Rail Needs Assessment for the North and Midlands, which was published in December and included an option to leave out most of Line 2b East until 2050 and beyond, something which local authorities claim would have a “devastating” economic impact on the region.

Chesterfield Borough Council has referenced the Staveley Corridor regeneration, which is centred around a new HS2 Staveley Infrastructure Maintenance Depot (IMD) and promises a huge scope of opportunity for the area, with creation of jobs, infrastructure, housing and inward investment.

Opportunities for growth and regeneration include the £125m reopening of the Barrow Hill Line, a £100m link road, the development of 3,500 new homes and the creation of 2,200 new jobs around the area. But the IMD will only be required if HS2 East is delivered in full by 2040.

The document also covers the lasting legacy of HS2 in the eastern region, which would see one million people better connected by the line, 10,000s of cars taken off the roads and 1,000s of bi-modal trains replaced, supporting the government’s decarbonisation targets.

Much of HS2 East’s proposals are focused around masterplans which are already in place for the development of Chesterfield and Sheffield Stations, incorporating pedestrian friendly access and local public transport links.

Responding to the publication of the report last week, Councillor Tricia Gilby, Chesterfield Borough Council Leader, said she was ‘hugely disappointed’ that of the options presented the National Infrastructure Commission does not recommend delivery of the eastern leg of HS2 in full.

“This directly conflicts with the Government’s pledge to levelling up in areas like ours. It also seriously undermines local plans for growth in the North and the Midlands,” Cllr Gilby added.

Now Councillor Gilby joins other regional leaders in pushing forward the case for the Government to commit to the HS2 Eastern Leg in full – to realise the ‘once in a generation’ opportunity to shape the region’s future, and avoid land already earmarked for related development being left in limbo for years.

“After decades of underinvestment in strategic rail infrastructure, delivering HS2 is a once in a generation chance to transform connectivity, attract investment, create new jobs, build new homes, boost skills and opportunity and level-up communities across the North, Midlands and beyond. This is even more crucial to our economic future in optimising recovery from the pandemic, which has hit the North and Midlands hard.

“For Chesterfield, the failure to deliver the Eastern Leg in full means facing the prospect of reduced connectivity for our communities, as well as damaging the momentum we have built up around our ambitious comprehensive plans for both Staveley and the area around Chesterfield Station.

“In the Staveley area alone, planned growth worth at least £1bn has been catalysed by the planned HS2 maintenance depot. Taking this away would be a huge blow for an area that has had its hopes raised on the back of HS2’s plans and would leave a huge question mark over how we can deliver the ambitious growth plans our communities need and deserve.

“It is vital that the Eastern Leg of HS2 is delivered in full and that delivery starts as soon as possible. This is about more than just rail and trains – it’s about new jobs, new homes and new starts for communities that have been denied these opportunities over many years.

“This is a critical issue for Chesterfield and Staveley. I will not rest in working with council and business leaders along the planned Eastern Leg to hold Government to account and to ensure that the Prime Minister honours his commitment to deliver HS2 East in full. Time is of the essence to re-assert the strength of Chesterfield’s social and economic case ahead of Government’s planned publication of its Integrated Rail Plan.”

Scott Knowles, Chief Executive at East Midlands Chamber, said: “HS2 East is home to 13 million people, and about six million jobs, equating to 20% of the UK, larger than the economy of Denmark. Chesterfield shows how the investment does far more than just getting people to city centres. The importance of this opportunity to regenerate, level up and make a real difference to people and communities cannot be overstated and must not be missed.”

Dom Stevens, manager of Destination Chesterfield commented: “Chesterfield is already moving forward with significant plans and developments so that the town can maximise the wide range of economic benefits HS2 has to offer.

“The originally proposed spur of the line arriving at Chesterfield Station will improve connectivity, journey times and capacity on our rail network locally and nationally, bringing with it vital investment opportunities.

“We would urge the NIC to rethink its recommendations and take into the account the huge strides our town has already made to regenerate its economy, with HS2 playing a huge role in attracting new people into the area to invest, live and work.”

To read Don’t Cut Here! A Case study on Why the economies of Chesterfield and Sheffield need HS2 in full online visit: www.chesterfield.gov.uk/media/1492665/chesterfield-borough-council-hs2-document.pdf

 

Posted in About Chesterfield, Business, Destination Chesterfield, Development, Featured, Home, Made in Chesterfield, UncategorisedTagged in , , , , , ,

DBC Training continues growth with opening of new centre in Chesterfield

Midlands based award-winning Training Provider, DBC are delighted to announce the opening of their new centre in Chesterfield, adding to their existing centres in Derby, Nottingham, Leicester and Hinckley. The Chesterfield office is in a prime, central location on Holywell Street and has easy access to parking and all the amenities Chesterfield has to offer.

The new centre will provide the local community with enhanced opportunities to learn new skills and receive expert support, providing a pathway to a new career across a wide range of sectors. DBC also work in partnership with local employees to match people to opportunities, providing a vital role in both supporting the local economy and local people.

The centre was officially opened by Toby Perkins, the Shadow Minister for Apprenticeships and Lifelong Learning and Labour MP for Chesterfield and Staveley on 7th December.

Mr Perkins said: “This is an incredibly exciting development, I know how crucial apprenticeships are and how important the independent training sector is in enabling smaller employers to access apprenticeships. Apprenticeships also support young people into taking those first steps onto that career ladder or providing opportunities for more experienced people to retrain and learn new skills and begin a new career path”.

He continued “At a time when skills and training need to be at the top of the political agenda it is incredibly pleasing that DBC is opening a site in Chesterfield”.

Managing Director Kerry Bentley expressed her delight at being able to open a new centre and continue the Company’s next phase of growth: “We are proud to open our new centre as it signifies real opportunities for local people and local employers to grow and develop their careers and businesses. We work exceptionally hard to ensure the specialised work-related training we offer is able to be accessed by as many people as possible to provide opportunities that transform lives and fulfil aspirations.

“The new offices in Chesterfield will, without a doubt, help us to keep moving forward and allow us to offer our services to Employers and Apprentices in a new and exciting location”.

Founded in 2000, DBC Training is a leading provider of training and employment solutions.VFor more information visit http://www.dbc-training.co.uk

DBC Training supports the marketing and economic growth of the town through Chesterfield Champions, a network of over 180 organisations across Chesterfield and North Derbyshire.

Toby Perkins MP

 

Posted in About Chesterfield, Business, Destination Chesterfield, Development, Home, UncategorisedTagged in , , , , ,

Refurbishment of older persons housing in Chesterfield shortlisted for three awards

A £3.8m investment to transform and modernise housing schemes for older people in Chesterfield has been shortlisted for three awards at this year’s Constructing Excellence East Midlands Awards.

The project, which has seen the refurbishment of Brocklehurst Court, Glebe Court and Catherine Court has been shortlisted for the ‘Building Project of the Year’, ‘Health, Safety & Wellbeing’ and the ‘Integration & Collaborative Working’ at this year’s awards that will take place virtually on Friday 4 December.

Each of the older persons housing schemes have been refurbished and modernised by Chesterfield Borough Council’s main contractor, Fortem Solutions Ltd. as part the council’s commitment to investing in its housing stock to ensure that a supply of affordable, modern and attractive homes can be maintained for local residents in every stage of life.

The transformation of the sheltered housing in Chesterfield began in October 2017, when Chesterfield Borough Council appointed Fortem through the Efficiency East Midlands Framework. Brocklehurst Court was the first scheme to undergo a facelift, with the outdated 1970s building of bedsits and small flats converted into 17 comfortable one and two-bedroom flats.
After the success of Brocklehurst Court, Chesterfield Borough Council tasked Fortem with the £1.5m refurbishment of Glebe Court, then the £1.5m overhaul of Catherine Court, where properties refurbished throughout to create both a bright and welcoming living environment for residents.

Councillor Chris Ludlow, Chesterfield Borough Council’s cabinet member for housing, said: “We’re delighted that we have been shortlisted for these awards and it is great to be recognised for the work that has been put in by Fortem and the council to help improve housing for older people in our local community.

“We are committed to improving the quality of life for local people and a key part of our housing strategy is to make sure that our homes are of excellent quality and create a modern and desirable environment. The specification and quality of the work on these schemes has drawn attention from other local authorities, with representatives visiting the schemes in order to see how they could transform sheltered housing in their areas.”

James Taylor, Contracts Manager at Fortem who is leading the Chesterfield refurbishment schemes, said: “The refurbishment of the sheltered housing schemes across Chesterfield has been an amazing journey. The transformation of the properties, through collaborative design and on site working between Fortem and Chesterfield Borough Council, have led to a sector leading standard of refurbishment.

“We are proud to work with the Council on schemes which are in the heart of the local community. The works have allowed us to provide a sociable, light, and spacious living environment for the residents, while supporting social initiatives such as Gussies Kitchen and the Cosy Hub, ensuring we leave a legacy in the area which will be felt for many years to come.”

The project to transform and modernise sheltered housing in Chesterfield is in progress, further works are in progress to refurbish Mallard Court and Leander Court and works will then follow on at Aston Court. When complete all the Council’s sheltered housing will have been transformed into high quality affordable homes for our older residents.

Find out more about living in Chesterfield here 

Posted in About Chesterfield, Business, Destination Chesterfield, Development, Featured, Home, UncategorisedTagged in , , , , , , , ,

Markham Vale North development nears completion as last two units take shape

HBD and Derbyshire County Council’s Markham Vale North is nearing completion with the steel structures already completed for the final two units being delivered for Aver Property in a £25m deal, a joint venture between Ergo Real Estate and NFU Mutual.

The final two buildings on Markham Vale North – known as Orion – will provide an additional 221,518 sq. ft. and 75,500 sq. and are expected to complete in Q2 2021.

Markham Vale is a partnership between HBD and Derbyshire County Council. A 200-acre business park with direct access to the M1 via a dedicated junction, it is one of the region’s flagship locations and has been a catalyst for the creation of thousands of new jobs.

The scheme offers bespoke industrial, warehouse, hotel and office builds. Existing occupiers include Great Bear and Bilstein Group.

Anthony Clitheroe, Director at HBD, said: “Construction is progressing quickly on the two units, which we expect to complete in Spring – large, high-quality industrial stock remains in short supply in the UK, particularly in strategic locations like this, so interest has been high.

“These last two units complete the North side of the scheme. A further 13-acres remain across Markham Vale East and West, capable of accommodating 220,000 sq. ft.”

Leigh Burnett, Asset Manager for Ergo said: “Aver is delighted to be involved in the development of Orion at Markham Vale North. These are well located, high quality industrial buildings that will perform well in the both the short and long term. Markham Vale is a landmark development which benefits from proven longevity and appeal, it is a great location for distribution and production businesses.”

Derbyshire County Council’s Cabinet Member for Clean Growth and Regeneration Councillor, Tony King, said: “These two new units will be great additions to Markham Vale and will open up exciting opportunities for new businesses to join the site.

“We’re committed to supporting businesses – now more than ever to help them survive and recover from the downturn brought about by the coronavirus pandemic.

“It’s really positive to hear that we’ve already had some good interest from companies about the new units and the investment in Markham Vale by Aver Property shows a great level of confidence in the Derbyshire economy and its potential for growth.”

To date, HBD has delivered 2,000,000 sq. ft. of industrial, logistics and warehousing space at Markham Vale in what has been a hugely successful 16-year partnership with Derbyshire County Council.

Posted in About Chesterfield, Business, Destination Chesterfield, Development, Home, UncategorisedTagged in , , , , ,

December blog- Peter Swallow, Chair of Destination Chesterfield

Destination Chesterfield chair Peter Swallow has provided an update to businesses and residents in Chesterfield, as we take a look back on the positive developments which have progressed in the town this year and look ahead to Christmas and 2021.


Peter Swallow Chair of Destination Chesterfield

Despite the challenges that 2020 has thrown at us all, we end the year on a positive note and a message of hope.

It would be very easy to write-off 2020 as an unmitigated disaster. We have all been bombarded with Covid-related bad news throughout the year. However, amongst the doom and gloom there has been some good news, and a common thread of hope throughout the year.

Development and investment, which will lay the foundation for future jobs in the town, has continued throughout 2020. Significant headway has been made on the new Enterprise Centre being constructed on the donut car park, and construction of the new ‘grade a’ offices at Chesterfield Waterside got underway.

Despite the imposed social distancing, I believe that Chesterfield’s communities have become closer and more supportive of each other during the pandemic. Although there are high hopes for the vaccine which has recently been announced, it is important that we maintain the Shop Local momentum over Christmas.

Chesterfield is a resilient and adaptable town and nowhere is this more evident that on our high street.

We have seen businesses adapt overnight – from doorstep deliveries of beer, tea and coffee, drive and buy fruit and veg on the market, to website launches and takeaway gourmet meals to cook at home. These small things have kept us all connected and smiling!

Non-food retailers, restaurants, bars and cafes have had it particularly tough. However, we have embraced the Shop Local message and gone out and supported local businesses enabling the survival of many.

In these challenging times it has never been more important to support each other. I am delighted that Destination Chesterfield and Chesterfield Borough Council have continued to work collaboratively this year on the Christmas in Chesterfield Campaign. Combining our efforts will reinforce the Support Local message.

We may not be able to physically get into the high street businesses, but many independent retailers, restaurants and cafes offer us access to their products and services from the comfort of our homes using our laptops, tablets, telephones and perhaps even carrier pigeons (OK, maybe not carrier pigeons——!)

Making the decision to choose an independent retailer for your gifts and food both now and beyond the pandemic will make a huge difference to our high street.

As we look to 2021, there can be no simpler message for the town other than ‘support each other.’

I wish you all a happy and HEALTHY Christmas and New Year.

 

Posted in About Chesterfield, Blog, Business, Celebrate Chesterfield, Christmas, Destination Chesterfield, Development, Leisure, Made in Chesterfield, VisitingTagged in , , , , , , , ,

Keep up to date

Dont miss out on all the latest news, updates & special offers.

Signup to our newsletter